Rockyview General Hospital – Various Upgrades

The work consists of excavating through 3000 mm of asphalt and subgrade to expose the valves on the fire hydrant lines, to replace four valves. Implementation required site safety fencing and flagging to have one-way traffic flow during construction.
Client
Rockyview General Hospital
Contract Type
Construction Management
Project Value
$762,821
Rockyview General Hospital

The work consists of excavating through 3000 mm of asphalt and subgrade to expose the valves on the fire hydrant lines, to replace four valves. Implementation required site safety fencing and flagging to have one-way traffic flow during construction.

The main PRV’s that provide steam to RGH are original and and must be replaced urgently. Items to be replaced are four (4) Main Isolation Valves, one (1) Bypass Valve, two (2) Strainers, two (2) PRV Actuating Valve Controllers, and four (4) Regulating Stations (including valve actuator and switching from pneumatic to pneumatic/digital.)

 The work associated with this phase involves upgrading door security, hardware and surveillance equipment throughout the hospital. This included creating alternative pathways and IP&C hoardings to allow for the work to take place.