Bird was responsible for the engineering, procurement, and construction of the Raw Pea Silos Reception & Storage facility. As part of the project, we performed the equipment selection, installation and pre-commissioning of the turnkey facility.
The construction scope included all deep foundations, civil, concrete, structural, architectural, mechanical, electrical and controls. The facility included food-grade pea handling equipment.
Back to projects