Skip to main content
logo-bird-white

University of Manitoba Pembina Hall Student Residence

During construction, Bird erected one of the largest steel box trusses ever installed in Manitoba. The truss joins the 14- and 15-storey towers at the fourth level spanning the existing Pembina Hall building. The colossal 60-ton truss measures 51-metres long, five-metres high, and 2.4-metres wide. The truss took months of planning and fabrication, eight days of assembly, and two 300-ton cranes to install. Precision was crucial with each of the towers a mere six millimetres out-of-plumb to allow the box truss to fit into place.

Client
University of Manitoba
Consultant
Raymond S.C. Wan Architect
Contract Type
Stipulated Sum
Project Size
12,077 sq. m
(130,000 sq. ft)
Duration
18 months
Project Value
$39,000,000
Construction Progress of Curtain Wall Installation Above Existing Building with Scaffolding

With no time in the schedule for delays or disruptions, Bird successfully delivered this contemporary, urban style highrise building in time to house 360 students for the new school year.