The Child Welfare Centre is a seven-storey office building with three levels of underground parking for 182 vehicles. One of the unique opportunities was the reduction of parking requirements to accommodate current zoning standards. The sharing of parking with the future residential development and the proximity of public transit enabled overall parking on the site to be reduced significantly.
The Child Welfare Centre was constructed on a tight site directly adjacent to a historically significant building, which necessitated a carefully managed and monitored shoring program. Bird completed both the building shell and the tenant improvements within the owner’s time frame and budget.
[[Auto Insert Gallery here]]
Back to projects