With a raised floor design throughout the facility, Bird successfully managed the complex installation of air supply, duct work, electrical and plumbing systems prior to floor installation. These systems required upfront strategic planning and execution to ensure the rest of the building’s intended layout fit into place. Acoustical design considerations were critical for the council chambers to create a secure and sound attenuating environment. The extensive millwork panelling was installed with an acoustical dampening treatment that necessitated an intricate installation process.
[[Auto Insert Gallery here]]
Back to projects