The team was responsible for the structural scope of fabrication and installation of building structural steel, platforms, exterior supports, stair towers, as well as pipe and electrical supports. Mechanical works included the installation and assembly
of fiberglass, gas cooling tower and onsite vessel splicing, wet gas fan, process pumps and ducting throughout the entire plant. The piping scope included the fabrication and installation of piping including tempered water, safety showers, natural
gas and service water, process piping such as cooling water, instrument/plant air, caustic soda and weak acid, as well as pipe insulation on pipelines as required.
Electrical work was vast and included the installation of equipment such as transformers, automation equipment, medium voltage switch gear, power factor capacitators, heat tracing, receptacles, the communications system and overhead power line. Architectural
finishes rounded out the project, and included the installation of masonry walls, cladding, insulation, roofing, and acid brick lining.