Bird worked with the consultants to re-design the reinforcing requirement, ultimately reducing the requirement for work in the existing tenant space on the first level by 95%. These changes resulted in a more economical plan, significant cost savings and a reduced schedule.
[[Auto Insert Gallery here]]
Back to projects