Bruce Power MCR Office Complex

The Major Component Replacement (MCR) Office Complex was constructed to house the staff required to manage Bruce Power’s MCR project that is underway at the Bruce Power site. In addition to the training facility, the almost 11,150-square-metre complex included a two-storey office area with office space, classrooms, amenities, and facilities for 500 employees. Site development included site services, a stormwater pond, the extension of a municipal road into the site, parking, and landscaping.

Client
Bruce Power LP
Consultant
Stantec Consulting Ltd.
Contract Type
Design-Build
Project Size
11,150 sq. m
(120,000 sq. ft)
Duration
16 months
Project Value
$58,000,000
Aerial view of office complex

Bird was part of a consortium led by Concert Infrastructure and took the lead on the Design-Build components of the project. Bird’s extensive experience in delivering complex projects with specific technical requirements facilitated reduced upfront capital expenditure for the client. Bird’s ISO 9001:2015 certification was a requirement for this project and added further value during the execution, ensuring that quality management standards were maintained at the highest level.